Erchong Floodway Project
- Commissioned by
- Gengliao Elementary School, New Taipei
- Location
- Wugu, New Taipei
- Year
- 2021

Focusing on the school’s history of being forced to relocate when the Erchong Floodway was built, we wanted to find a way to express the relationship between this elementary school and water, and the migration path the school once took and still treasures.

Erchong Floodway Project sketch: Wang Chika wanted to use construction dust cloth, representing the shifting landscape of a place still under constant construction

Erchong Floodway Project sketch: since the two of us disagreed, this design merges the footprints with construction dust cloth

Erchong Floodway Project sketch: Lee Wei-cheng wanted to use the footprints waterbirds leave on the mudflats, remembering migration as part of nature

Erchong Floodway Project: early design sketch


